Annabelle Ewing’s push for a direct Perth–Edinburgh rail link

For many people in Perthshire, the journey to Edinburgh should feel like an intercity trip rather than a planning exercise. Annabelle Ewing, the Scottish National Party candidate for Ochil and South Perthshire, is pressing for a direct rail link from Perth to Edinburgh via Gleneagles, with passenger needs at the centre of the proposal.

A straightforward service would give workers, students and visitors one ticket and a protected journey, while easing pressure on the M90 and A9. Frequent early, late and weekend trains would make the route useful for business, education and leisure rather than only the commute.

Ewing brings a legal career and previous parliamentary service as both an MSP and an MP for the constituency to this campaign. Her wider platform links Scottish independence, economic recovery and strong representation at Westminster, placing transport within a wider debate about how Scotland is governed and how its communities prosper.

The proposal offers a useful reference point for Australian travellers and transport planners. Perth in Western Australia, Adelaide, the Sydney–Melbourne corridor and regional rail towns across Australia show how services win passengers through simple fares, local connections and dependable timetables.

A clearer route for Perthshire

Gleneagles sits on the rail corridor linking Edinburgh with Glasgow, giving Perthshire a natural connection into Scotland’s central intercity network. A service explicitly routed through the hub could offer one clear proposition: board in Perth, travel via Gleneagles and arrive in Edinburgh without managing separate tickets or awkward changes.

The value is not limited to journey time. A straightforward route can improve confidence for first-time passengers, make rail more attractive to occasional travellers and give employers a dependable option when recruiting from across central Scotland. Clear naming, coordinated booking and published connections would turn a transport proposal into a product people can use.

Gleneagles as the strategic connector

Gleneagles is more than a place on a map. Its conference, hotel and leisure economy depends on access, while Perth businesses benefit when visitors can reach the capital without making the final part of the trip by road. A direct Perth service could widen the visitor market and distribute more spending along the corridor.

The case still has to withstand scrutiny. Transport Scotland, ScotRail, Network Rail and local authorities should test capacity, engineering needs, disruption resilience, affordability and the effect on other services. Any business case should compare the passenger benefit with the full public cost, including links from rural communities to stations.

A campaign grounded in evidence

Ewing’s legal and parliamentary background gives her a practical basis for that scrutiny. Having represented Ochil and South Perthshire in the Scottish Parliament and at Westminster, she can set out the case in terms of public value, local accountability and the choices facing ministers.

Her independence message adds a constitutional dimension without changing the practical test. A connected Scotland needs an economy that can attract investment, support skills and give businesses access to customers. Rail policy can therefore be presented as part of economic recovery, while Scottish representation at Westminster matters when decisions affect local services and public funding.

Benefits that can reach beyond the tracks

For Perthshire, the potential gains include easier access to jobs, colleges, health services and events; lower travel costs for regular passengers; and a better alternative for visitors who would otherwise drive or fly. Frequent service could also reduce pressure on congested roads and support lower-carbon travel choices where practical.

Those benefits depend on more than track length. Fares must remain understandable, trains must arrive when passengers can use them, and stations need good onward bus, walking and cycling access. Clear measures such as passenger numbers, reliability, journey time and local economic activity would allow the public to judge whether the project earns continued support.

Lessons from Australian regional rail

Australia offers a revealing comparison. Perth’s metropolitan rail system serves a sprawling, car-dependent state, while the roughly 425-kilometre corridor to Adelaide has to compete with air, coach and road travel. In a market shaped by left-hand driving and high car use, rail must offer a clear time and price advantage rather than rely on environmental appeals.

Further east, the approximately 870-kilometre route between Sydney and Melbourne demonstrates the appeal of overnight intercity rail, coordinated regional timetables and one booking across several operators. Regional services in New South Wales and Queensland also show the importance of timed connections, convenient stations and simple, reliable information.

The lesson for Ochil and South Perthshire is not to copy Australian distance or funding models. It is to design the Scottish service around door-to-door time, an easy ticket, a dependable final train and practical station access. Those are the features travellers in cities such as Perth, Adelaide, Sydney and Melbourne increasingly expect.

A practical plan for Perth–Edinburgh

Ewing’s proposal is strongest when it moves from a compelling idea to a costed programme. The route should be tested against practical benchmarks familiar to passengers and public authorities.

Measure Perth–Edinburgh proposal Australian reference
Passenger promise One ticket and one through service via Gleneagles Simple booking across regional and intercity operators
Time focus Timely arrivals for work, education and leisure Door-to-door times compared with driving and flying
Local access Coordinated feeder buses, walking and cycling Timed connections in regional rail networks
Reliability Protected paths and published service standards Reliable CountryLink-style scheduling
Public value Demand, cost, carbon and economic effects tested Business cases assessed against passenger benefit

Six practical steps would give the campaign a credible programme:

  • Publish a full business case covering capital cost, operating cost, demand and disruption.
  • Guarantee one ticket and protected connections across the complete journey.
  • Set frequencies for early, late, weekend and seasonal travel.
  • Coordinate station access with local buses, walking and cycling routes.
  • Publish reliability, passenger-volume and economic-benefit targets.
  • Require regular public updates from Network Rail, ScotRail and ministers.

Back the campaign’s practical work and help make Perth–Edinburgh via Gleneagles a settled transport priority. Follow the proposal, voting information and campaign updates through Annabelle Ewing’s campaign website, and share the case with people who rely on Perthshire’s transport connections.